수량산출
BIM
- We suggest structure modeling in 2D drawing and the basis for calculation using BIM.
- Clients can have Bim structure modeling and the basis for calculation in your hand with 7-30 days.
Take-off : Building material/resources required for the project are calculated by RC-8.0 program created by Koreasoft Co.,Ltd.
Resources Available
-
01.Supporting resources on BIM structrual modeling
- Building estimate summary sheet: General estimate summary sheet / Estimate summary sheet on each floor and member / basis for calculation
- Quantity analysis table : Analysis of quantity per pyong / Checklist on each floor / Placing information list
- BIM modeling : General modeling / Files for modeling on each floor
Main project
-
BIM 산출 춘천시 약사동 주상복합 진행중
- Type주상복합
- Gross Floor Area49,306m2
- Year2023
-
BIM 산출 안산 주공 재개발공사 진행완료
- Type주거시설
- Gross Floor Area158,371m2
- Year2023