수량산출

BIM

  • We suggest structure modeling in 2D drawing and the basis for calculation using BIM.
  • Clients can have Bim structure modeling and the basis for calculation in your hand with 7-30 days.
Quantity take-off using REVIT program Structural modeling : BIM team gives the BIM structrual modeling and the models can further be used to calculate building material/resources required for the project.
Take-off : Building material/resources required for the project are calculated by RC-8.0 program created by Koreasoft Co.,Ltd.

Resources Available

  • 01.Supporting resources on BIM structrual modeling

    - Building estimate summary sheet: General estimate summary sheet / Estimate summary sheet on each floor and member / basis for calculation
    - Quantity analysis table : Analysis of quantity per pyong / Checklist on each floor / Placing information list
    - BIM modeling : General modeling / Files for modeling on each floor

Main project

  • BIM 산출 춘천시 약사동 주상복합
    진행중
    • Type주상복합
    • Gross Floor Area49,306m2
    • Year2023
  • BIM 산출 안산 주공 재개발공사
    진행완료
    • Type주거시설
    • Gross Floor Area158,371m2
    • Year2023
Go Top