수량산출
Quantity verification on construction site
- Existing quantities on site can be estimated and reviewed by CAD Calculation Program.
- Problems can be identified easily by accurate and precise report on quantity take-off and comparison.
- We provide practical resources which can be used on site.
- Working days depend on construction size and type and take 5-10 days.
Resources Available
- 01.Quantity Verification Report
-
02.Supporting resources on Finshing materials
- Building estimate summary sheet : General estimate summary sheet / Estimate summary sheet on each floor / Estimate summary sheet on basis for calculation / basis for calculation
- Quantity analysis table : Analysis of floor / Analysis of ceiling / Analysis of exterior wall
- CAD calculated drawings : Quantity for window and door / length depending on kinds of brick masonry / figures on rooms / outer lines -
03.Supporting resources on structural member
- Building estimate summary sheet: General estimate summary sheet / Estimate summary sheet on each floor and member / basis for calculation
- Quantity analysis table : Analysis of quantity per pyong / Checklist on each floor / Placing information list
- CAD calculated drawings : Number of column / Length of retaining wall/ Length of Girder and Beam / Slab area
Main project
-
현장 물량 검증 춘천 레고랜드 테마파크 진행완료
- Type문화시설
- Gross Floor Area88,469m2
- Year2018
-
현장 물량 검증 리안월드 석모도 진행완료
- Type숙박시설
- Gross Floor Area11,570m2
- Year2019
-
현장 물량 검증 이화여대 제2부속병원 진행완료
- Type병원
- Gross Floor Area220,032m2
- Year2016
-
현장 물량 검증 성남의료원 진행완료
- Type병원
- Gross Floor Area82,810m2
- Year2016
-
현장 물량 검증 수영만 요트경기장 진행완료
- Type오피스
- Gross Floor Area18,688m2
- Year2015